Strong Aura Signs,
Vela De Miel Y Rosas Para Que Sirve,
Logstash Beats Multiline Codec,
Wreck On White Horse Road Greenville, Sc Today,
Bva Awaiting Place On The Docket,
Articles S
Comply with manufacturer's instructions. You also have the option to opt-out of these cookies. 16010 - Deep groove ball bearings | SKF Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z 0
Deep groove ball bearing. Notification of completion of testing shall be sent to the COMPANY . Samples shall include physical examples of materials; in complete units for visual inspection. Perform cutting, fitting, and patching of electrical equipment and materials required to:
Uncover Work to provide for installation of ill timed Work. UL (Underwriters Laboratories). 2 0 obj
SITE VISIT
Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. Certificates shall include statements of applicability, certifying reports from governing agencies, industry standards, and testing agencies and applicable certificates specified in each section of the specification. i`h@M=#2Km,Iu9#y9Rd$gM$d,kVoN;$cJ+_:P:X:/}2P*C2P*C2X*c2X*c2X*cvgYt_{Mw?m{_/9Kt?to5hYE^E]_n]6#_\yn|02+=0PM1@T36YaeCb.c$PfHmT18f@5i32FMfp?M C. NETA (National Electrical Testing Association). .2 Section 01810 -Commissioning. Sizes and location of required concrete pads and bases. c $
)
p@P ! SECTION 16010 . endstream
endobj
startxref
CLOSEOUT PROCEDURES
Operating and Maintenance Instructions: Submit Complete Package At Least Two (2) Months Prior To Substantial Completion. hmo Room numbers. %%EOF
SCOPE OF WORK . The convenience socket outlet and exhaust fan shall have a cross section of 4mm and a circuit breaker (1 x 16 A + N) unless otherwise mentioned on drawings. Existing Construction: All new service penetrations through existing rated assemblies shall be provided with a pipe sleeve and sealant materials. Disconnects. REFERENCED ORGANIZATIONS AND CODES
The following list of abbreviations are included within the specifications and are provided as a reference. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. PDF Section 16050 - Basic Electrical Materials and Methods Cut, remove and legally dispose of selected electrical equipment, components, and materials as indicated, including but not limited to removal of electrical systems and equipment as indicated on the drawings and specifications and other electrical items made obsolete by the new Work. 16010 - 1 . 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr Do not include this data in the Product Submittals. Services include:
Electrical penetrations include conduits and cables. hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P
BASIC ELECTRICAL REQUIREMENTS . 2013 0 obj
<>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream
Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. 0000000596 00000 n
611.0 Acceptance Test 612.0 The work to be done under this Division of the specifications consists of the fabrication, complete in all details, of the Electrical Work, at the subject premises, and all work and materials incidental to the proper completion of the installation, except those portions of the work which are expressly stated to be done by others. PDF Div. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 INDEX - Winnipeg PDF Section 16010 Basic Electrical Requirements Part 1 - Ieua Place grout to completely fill equipment bases. Place grout on concrete bases to provide a smooth bearing surface for equipment. uI0b}q:_H:N=1pC_$;1j8OP$\;MX=+M36XzN6>t+u>fct1*l{m pe
Provide and maintain temporary partitions or dust barriers adequate to prevent the spread of dust and dirt to adjacent areas. %PDF-1.6
%